資源
香港專上院校所提供之論文/研究刊物
院校 | 題目 | 類型 | 日期 | 作者 | 摘要 | 網頁 |
---|---|---|---|---|---|---|
HKUST | Integrating 4D BIM and GIS for construction supply chain management | Journal | 02/2019 | Deng, Y., Gan, V.J.L., Das, M., Cheng, J.C.P., and Anumba, C.J. | Construction supply chain management (CSCM) requires the tracking of material logistics and construction activities, an integrated platform, and certain coordination mechanisms among CSCM participants. Researchers have suggested the use of building information modeling (BIM) technology to monitor construction activities and manage construction supply chains. However, because material warehousing and deliveries are mostly performed outside construction project sites, project information from a single BIM model is insufficient in meeting the needs of construction supply chain management. In this research, an integrated framework was developed based on four-dimensional (4D) BIM and a geographical information system (GIS) for coordination of construction supply chains between the construction project sites and other project related locations, such as supplier sites and material consolidation centers. The proposed integration was used to solve three common tasks in CSCM, namely (1) supplier selection, (2) determination of number of material deliveries, and (3) allocation of consolidation centers, using information from 4D BIM and GIS. The proposed 4D BIM-GIS framework was demonstrated via case studies. The results of the case studies indicated that determinations of supplier and number of deliveries need to take into account both the transportation distance and material unit price. Mathematical solutions were also generated to support decision making for the allocation of consolidation centers in congested regions with long transportation distances. The outcomes of this paper serve as a decision support base for a more efficient CSCM in the future. | 連結 |
HKUST | Incorporating Project Management Techniques in Building Information Modeling Projects | Report | 06/2017 | Hao WU Vincent Cheuk Hang TSE Chris Ho |
Building information modeling (BIM), which is becoming widely adopted by the construction industry for its superior efficiency and conveniences. However, due to great differences distinguished by conventional project construction process, traditional construction system cannot be perfectly exploited in BIM projects. Therefore, developing adaptive project management techniques are significantly essential to facilitate the BIM project implementation in the future. In this study, contractual framework, project delivery approaches and information management standard are studied. Based on the existing standards and feasible delivery and information exchange methods, comparisons and suggestions are given to improve BIM project management level from both technical and legal perspectives. In addition, potential BIM related claims with case study are also explored in this paper. Refer to the content investigated, some preliminary conclusions and recommendations are given for the purpose to achieve higher BIM project quality. | N.A. |
HKUST | Incorporating Project Management Techniques in BIM Projects | Report | 06/2019 | Ziwei YU Luo Yanfang |
In order to manage a project seamlessly, there is a need to establish effective communication between different departments and identify the risks in the project, determine the affected or influencing stakeholders, provide timely resources and logistics, and manage the available resources to make a framework for project implementation. There are several standards and one of the most recognized standards is the Project Management Knowledge Facility (PMBOK). PMBOK is not just a guideline and a methodology for project management, but also can help projects for professional, targeted and comprehensive management. Building Information Modeling (BIM), a project management methodology has been adopted in recent years to design a project integrated as a 3-D information model, which adds all project information in the various phases of the project to a 3-D information model. For a correct BIM implementation in a project, BIM must be integrated into the overall management of the project and must have a BIM Execution Plan (BEP) adapted to the needs of the client and which in turn is integrated into the project management plan. To review BIM/BEP and project management comprehensively, this research consists of three main stages: (1) select of target database examining both academic and applied publications to analyses the situation between BIM/BEP and PMBOK; (2) conducts two surveys about “BIM/BEP with PMBOK” and “BIM project with Risk Management” to have deep understanding of the industry status; (3)select integration, stakeholder and risk management as specific aspects to analyze, and develop a preliminary framework of process guide for BEP. | N.A. |
HKUST | Incorporating Project Management Techniques in BIM Projects | Report | 06/2018 | Ping Hon YAU Ziyan LIU Ho Yuen NG Sherman WONG |
Building Information Modelling (BIM) has had a profound effect on the construction industry. It has greatly improved coordination among stakeholders, enhanced productivity, and increased profits. However, risks and hazards are also increasing with the growing complexity and scale of AEC projects, and the adoption of BIM technology will also place barriers and obstacles even though the technology has been proven to show its various benefits throughout the project lifecycle. Firstly, a literature review is conducted to identify risks and benefit of implementing BIM. twenty-one risks are identified and classified into three categories: Technology, Contract, and Project. Secondly, some suggestions for eliminating the increased risks are given. This paper will focus on how to implement risk management in BIM project against the recent technological background, and some related measures of mitigation, such as insurance, will be discussed. | N.A. |
HKUST | Identifying potential opportunities of building information modeling for construction and demolition waste management and minimization | Journal | 03/2017 | Won, J., and Cheng, J.C.P. | The amount of waste generated in construction and demolition (C&D) processes is enormous. Therefore, many studies on efficient C&D waste minimization and management have been conducted. However, 21 process-related and 8 technology-related limitations in C&D waste management and minimization have not yet been resolved. Building information modeling (BIM) helps project participants improve the processes and technologies in the planning, design, construction, and demolition phases, thereby managing and minimizing C&D waste efficiently. Therefore, this paper identifies the potential opportunities of BIM for efficient C&D waste management and minimization, such as design review, 3D coordination, quantity take-off, phase planning, site utilization planning, construction system design, digital fabrication, and 3D control and planning. The BIM-based approaches can support C&D waste management and minimization processes and technologies by addressing existing limitations through in-depth literature review. The roles of project participants and information required for each BIM-based approach in C&D waste management and minimization are discussed with illustrative process maps. | 連結 |
HKUST | Holistic BIM framework for sustainable low carbon design of high-rise buildings | Journal | 06/2018 | Gan, V.J.L., Deng, M., Tse, K.T., Chan, C.M., Lo, I.M.C., and Cheng, J.C.P. | In high-density, high-rise cities such as Hong Kong, buildings account for nearly 90% of energy consumption and 61% of the carbon emissions. Therefore, it is important to study the design of buildings, especially high-rise buildings, so as to achieve lower carbon emissions. The carbon emissions of a building consist of embodied carbon from the production of construction materials and operational carbon from energy consumption during daily operation (e.g., air-conditioning and lighting). While most of the previous studies concentrated mainly on either embodied or operational carbon, an integrated analysis of both types of carbon emissions can improve the sustainable design of buildings. Therefore, this paper presents a holistic framework using building information modeling (BIM) technology in order to enhance the sustainable low carbon design of high-rise buildings. BIM provides detailed physical and functional characteristics of buildings that can be integrated with various environmental modeling approaches to achieve a holistic design and assessment of low carbon buildings. In a case study, the proposed framework is examined to evaluate the embodied and operational carbon in a high-rise residential building due to various envelope designs. The results demonstrate how the BIM framework provides a decision support basis for evaluating the key carbon emission sources throughout a building's life cycle and exploring more environmentally sustainable measures to improve the built environment. | 連結 |