香港專上院校所提供之論文/研究刊物

關鍵字

以下資料由與建造業議會簽署合作備忘錄的專上學院提供。

院校

類型

Date: From

To

院校 題目 類型 日期 作者 摘要 網頁
HKUST Rebar Prefabrication Automation Leveraging BIM Technology FYP 06/2020 LEUNG, Jing
WONG, Ngo Nam Andrew
The construction industry attempts to focus on innovative construction methods and the use of IT to enhance productivity. In recent years, the application of Building Information Modelling (BIM) technology is more common in the market. BIM provides a platform for data exchange of different parties without any format conversion which facilitates cross-discipline communication. The Hong Kong government has been the pioneer in applying BIM in the design of some government capital projects to foster its usage in HK. However, BIM facilitates the stage of planning and designing, there should be ways to improve the performance in the construction stage. Dynamo is a built-in software of Revit to be used in this project to develop the construction information technology.

The objectives of this report are to introduce the use of Dynamo scripts for the generation of BVBS code, barcode, schedule, and drawings for automatic rebar fabrication with the assistance of Dynamo to a Revit BIM model. With the automatic generation and implementation of IT, time can be shortened and accuracy can be enhanced. By running the Dynamo scripts in this research, standardized detailed drawings and bar bending schedules can also be obtained automatically.
N.A.
HKUST Study on Legal Aspects of BIM Projects Report 06/2020 Ka Cheong TANG
Tsz Yin CHOW
Building Information Modeling (BIM) is an emerging technology applied in Architecture, Engineering and Construction (AEC) industry. With the increase in the BIM application, some legal uncertainties have appeared and led to a high risk in legal aspects when adopting BIM in design and construction projects. It is vital that BIM users should be aware of the potential legal issues and develop suitable legal documents and contracts to prevent these issues from occurring. Within this context, a critical review on different cases associated with BIM is carried out in order to provide an overview of potential legal issues. Model copyright, right of BIM common data environment control and responsible control were discussed. Furthermore, three protocols and guidelines commissioned by the United Kingdom, the United States and Singapore are compared and analyzed. BIM Protocol published by Construction Industry Council of the United Kingdom is suggested as the most comprehensive and structured protocol in the analysis. Recommendations on the aspects of BIM cyber security, practical completion and contractors’ perspective are made to Hong Kong AEC professional institutes to commission a suitable and comprehensive protocol for the local industry. N.A.
HKUST Study on BIM Project Execution Plan and BIM Uses in Comparison with PMBOK Report 06/2020 Ka Wing Ngan
HUANG Li
Project successful strongly relies on PMBOK. Besides that, BIM is important because it is a powerful tool in delivery of BIM-based project. To implement BIM, BIM uses are defined based on project goals. To effective implement BIM as planned, BIM project execution plan (PXP) is necessary to control BIM. In the first section, this paper compares supporting infrastructure from BIM project execution plan (PXP) to PMBOK to find out the relationship. The categories of supporting infrastructure are BIM PXP overview, project information, key project contacts, project goals / BIM uses, organizational roles / staffing, BIM process design, BIM information exchanges, BIM and facility data requirement, collaboration procedures, quality control, technological infrastructure needs, model structure, project deliverables and delivery strategy / contract whereas PMBOK are integration, scope, time, cost, quality, human resources, communication, risk, procurement and stakeholder management. From the investigation, it is found that risk and cost management is not obviously applied from the categories of supporting infrastructure. In the second section, this paper investigate the relationship of various BIM uses in terms of PMBOK. The considerable BIM uses are design authoring, design review, 3D coordination, cost estimation, phase planning (4D Modelling), digital fabrication and site utilization planning. It is also found that scope, communication and human resources management is not obviously applied from the selected BIM uses. In the third section, we recommend that for BIM PXP additional section including project cost management and BIM risk management should be included; and for BIM uses attention should be paid in drafting BIM PXP to support BIM uses and other BIM uses maybe considered. Manager may benefit from the relationship developed and recommendation in BIM implementation. N.A.
HKUST Risk Management in BIM Projects Report 06/2020 SIO Wai Lam
CHEONG Ka Yi
The objectives of the project are to identify the risks with high risk level and mitigation with higher effectiveness in BIM industry. The survey was conducted to collect the data of risks and mitigations adopted by different groups of people. Overall analysis, by-group analysis and cross-group analysis were performed.

Thus, the risks were analyzed and discussed with two approaches - level of consequence and level of probability. The level of risk was identified combining these two approaches. The assumption and resolution of identified risks were discussed. Mitigation strategies with higher appropriateness were identified and relevant comments were made.

It is found that the level of risk of C6 (Poor participation / contribution from project team in BIM adoption) and M1 (Lack of adequate expertise in BIM) are extreme, and are very high for risk T6 (Design conflict / clashes in BIM was not revealed / unresolved), C1 (Unclear requirements (e.g. EIR / AIR / contract) of BIM uses and specifications), C2 (Unclear roles, responsibility and liability in BIM implementation). As for mitigation strategy, it is found that mitigation #1 (Clear Employer’s Information Requirement) and #11 (BIM Education for Project Team) were mitigation strategies with the 1st and 2nd ranking in appropriateness/effectiveness. Mitigation can minimize risk C6, and mitigation #11 helps to mitigate risk M1.
N.A.
HKUST As-built BIM Model Verification Through Field Inspection and Laser Scanning: A Comparative Study Report 06/2020 HUANG, Cong
ZHOU Haoran
LIU Hao
BIM model is a prerequisite for the Operation and Maintenance (O&M) of sustainable buildings. Only after having a reliable BIM model can start O&M related work, such as space management and energy management, all these works needs to confirm the accuracy of the BIM model. In this project, the author conducted a verify of the BIM model to ensure that the model was correct before the O&M work started.
This project first compared various survey methods, and based on their advantages and disadvantages, chose the laser scanning method and manual survey method for experiments. Then using two selected methods to do site surveying for HUKUST parking lot and LTK to SENG Commons. And the end, given survey recommendations for different types of as-built model verification based on the survey result.
N.A.
HKUST BIM Model Reconstruction and Checking Using 3D Laser Scanning and Machine Learning Techniques Report 06/2020 LEI Ian Wang
IEONG Kuan Pui
In this project, the semantic segmentation performance of the deep learning model PointNet on Mechanical, electrical and Plumbing (MEP) is studied. Then, data of different similarity is used to test the model and the experiment of the mechanism of PointNet is conduct. Moreover, this project aims to evaluate the feasibility of generating a generalized model for semantic segmentation of MEP based on our own MEP point cloud data. On the other hand, the data preprocessing procedure is introduced. Finally, discussion about the result and conclusion are made. N.A.